1) EXECUTION OF CIVIL WORKS OF BHOOTHATHANKETTU SMALL HYDRO ELECTRIC PROJECT 24MW(3X8MW).(KSEB)

Description:

Planning,Engineering,Design ,Manufacture, Supply,Erection,Testing and Commissioning of Hydro-Mechanical and Electro-Mechanical Equipment,Electrical& Mechanical Auxiliary Equipment for Three Nos. Bulb Turbine including the Switchyard Equipment complete as per Tender Requirement of Bhoothathankettu(3x8MW) Small Hydro Electric

Scope of Work:

A)- Civil Works

  • Construction of Rectangular concrete Power Channel of 28 meter width, 312m length (approx), with bottom R.C.C lining 300mm thick and bed slope 1 in 2000.
  • Construction of a Power House of approximate size 53x25.5m, Tail Race Channel having a bottom width of 49m and a Switchyard of size 85mx50m which may vary as per Transmission requirements.
  • Construction of an access road to Power House having length 250m (approx), and width 7m.
  • Maintenance of the existing deviation road of approximate length 230m.
  • Construction of an RCC bridge of span 30m having a carriage way of 7.5m, over the power channel, in the existing Kothamangalam idamalayar road.

B) - Hydro Mechanical Works:

  • Design, Fabrication, Delivery, Erection, Testing and Commissioning of intake gates, Trash rack, Draft tube gates etc.,

2) EXECUTION OF ELECTRO HYDRO MECHANICAL WORKS OF BHOOTHATHANKETTU (3X8MW) SMALL HYDRO ELECTRIC PROJECT.KERALA.(KSEB)

Description:

Planning, Engineering, Design, Manufacture, Supply, Erection, Testing and Commissioning of Electrical, Electro-Mechanical and Hydro-Mechanical equipment of Bhoothathankettu Small Hydro Electric Project (3 X 8MW).

3) ISWD Construction of Integrated Strom Water Drain in cooum Water Shed of cooum Basin in Expanded Area of Chennai corporation Package- 11

4) ISWD Construction of Integrated Strom Water Drain in cooum Water Shed of cooum Basin in Expanded Area of Chennai corporation Package- 3

SALIENT FEATURES

LOCATION:

State : Kerala

District : Ernakulam

Taluk : Kothamangalam

RIVER BASIN:

River Basin : Periyar

River : Periyar

CATCHMENT AREA:

Catchment Area, Net catchment : 2122 sqkm

POWER HOUSE :

Location : Right bank of river

Size of Power House : 53m x 25.50m

Maximum gross head : 11.95m

Design Head : 8.54m

Installed Capacity : 24.0 MW

No. of units : 3 x 8 MW

Type of Turbine : BulbTurbine (Horizontal)

No. of Intake gates of PH : 3 nos

No. of Draft Tube gates : 3 nos